This is a demonstration of how Edge can be used for loadbalancing a business park:
- With multiple parking lots
- With a mixed brand of chargepoints
- With charge priorities on some chargepoints
- With multiple buildings guarded by energymeters
- With multiple solar installations
- With a Battery for peak shaving and self-consumption
- In a congested area (100KW contract). With possibilities for variable limits
The following video will walk you through this scenario: